Providing process design and start-up assistance for partial mix covered lagoon anaerobic digester system to handle cow manure from 1,500 heifers and source-separated organics feedstock with biogas that fuels a 400 kW CHP generator set and provides 1,500,000 Btu/hour of … Continue reading
Category Archives: project
Process design team member in preparing a Transfer Station Anaerobic Digester feasibility study to compare several anaerobic digester technologies utilizing nearby municipal wastewater sludge, food waste, fats-oils-grease (FOG) and source-separated organics feedstock to fuel a 300 kW CHP generator set … Continue reading
Albans, VT Regional Anaerobic Digester System Peer Review: Performed a Peer Review of a Preliminary Engineering Study to consider a regional anaerobic digester system in St. Albans, VT to handle cow manure and food waste to fuel a CHP generator … Continue reading
Performed design, RFP, construction administration and part-time observation services, USDA Rural Development certification and 1603 Treasury Grant commissioning report for a complete mix anaerobic digester facility to handle cow manure from a 1,000 head dairy farm and source-separated organics feedstock … Continue reading
My previous Company acted as Village Engineer for the 2.0 mgd ADF WWTF, assisting in various upgrades to the facility, which includes anaerobic digesters. This facility has a co-generation system which uses excess methane from the anaerobic digesters to fuel … Continue reading
Biosolids Processing Facility, South Burlington, VT Peer review and part-time construction inspection of paddle-type sludge drying/pelletizing system for processing 12,000 wet tons/year of biosolids. Expert witness for construction claim mitigation. Because of many affecting factors, it had become an increasing … Continue reading
Biosolids Screw Conveyor Provided design and construction phase services for a design-build horizontal screw conveyor to handle 15,000 tons/year of biosolids to be distributed in 40 c.y. trailer dump trucks at the central dewatering facility at the main Wastewater Treatment … Continue reading
Biosolids Composting RFP/Feasibility Study Prepared an RFP and a Feasibility Study with rating/ranking of biosolids disposal/reuse options. Assisted with implementation regional solution of beneficial reuse via windrow composting of 15,000 tons/year of biosolids; Project Manager. Men who have a restorative … Continue reading
Food Waste Digester Feasibility Study Selected as only firm to do a Desktop Feasibility Study for an Anaerobic Digester System for handling ~2,500 tons/year of food waste (pre-consumer and post-consumer, including cafeteria food waste) for all of Chittenden County. Prepared … Continue reading
Construction phase, first year, start-up and operator training services for 0.54 mgd Sequential Batch Reactor WWTF expansion/upgrade including biological phosphorous removal, septage receiving facility and a 400,000 gallon aerobic digester; Project Manager. A levitra consultation study has shown that around … Continue reading